Cornish Metals Inc. - AUDITED FINANCIAL STATEMENTS ENDED JAN 31, 2023
RNS Number : 6699X
Cornish Metals Inc.
27 April 2023
Icon Description automatically generated
CORNISH METALS RELEASES AUDITED FINANCIAL STATEMENTS AND MANAGEMENT'S
DISCUSSION AND ANALYSIS FOR THE YEAR ENDED JANUARY 31, 2023
Vancouver, April 26, 2023
Cornish Metals Inc. (TSX-V/AIM: CUSN) ("Cornish Metals" or the "Company"), a mineral
exploration and development company focused on its projects in Cornwall, United Kingdom, is
pleased to announce that it has released its annual audited financial statements and management,
discussion and analysis ("MD&A") for the year ended January 31, 2023. The reports are available
under the Company's profile on SEDAR (www.sedar.com) and on the Company's website
(www.cornishmetals.com).
Highlights for the year ended January 31, 2023 and for the period ending April 26,
2023
(All figures expressed in Canadian dollars unless otherwise stated)
· Completion of 10,159 meters of drilling at the United Downs exploration project with assay
results from the program confirming management's belief in the potential to develop a
Mineral Resource in the United Downs project area, subject to the availability of further
funding;
·
Four main targets were drill-tested: UD Lode, United Mines, Mount Wellington and Trenares
Lode, with all four targets returning results warranting further follow-up drilling (news
releases dated July 5, 2021, August 30, 2021, November 3, 2021, December 6, 2021, June
29, 2022 and August 23, 2022);
·
Discovery of the Wide Formation during the exploration program at Carn Brea with a
follow-up drill programme required to determine the continuity of mineralization and to
define the geometry and extent of the target, subject to the availability of exploration
funding (news release dated January 10, 2023);
· Completion of financing for gross proceeds of £40.5 million ($65.1 million based on closest
available exchange rate), including a strategic investment by Vision Blue Resources Limited
("VBR") of £25.0 million ($40.1 million), to advance the South Crofty tin project ("South
Crofty") to a construction decision (news releases dated March 27, 2022 and May 23,
2022);
·
Issuance of a second tranche of common shares pursuant to the restructuring of the
deferred consideration relating to the acquisition of the South Crofty tin project and
associated mineral rights in Cornwall (news release dated May 29, 2022);
·
Drill program underway at South Crofty to collect samples for metallurgical testwork as part
of the South Crofty Feasibility Study, with completion of the program expected in early
summer 2023 (news release dated July 10, 2022);
·
Key positions appointed to the South Crofty project management team, including Project
Manager for the construction and commissioning of the water treatment plant ("WTP"),
Feasibility Study Manager, Project Engineer, Health & Safety Officer and Human Resources
Advisor, with additional employees appointed to the mining team to support greater
mining related activities (news releases dated November 7, 2022 and March 5, 2023);
· Construction of the WTP is nearing completion including the installation of the treated water
discharge duct, concrete foundation pad, tanks and clarifiers, structural steel supports and
walkways, with the mechanical, electrical and instrumentation equipment being installed
from April 2023;
·
Commissioning of the WTP is planned for the summer of 2023 with a completion cost
estimated to be between £6.5 million and £7.0 million ($10.7 million and $11.5 million at
year end exchange rate);
·
Pump and pipe handling infrastructure installed in readiness for the expected lowering of
the pumps and pipes into New Cook's Kitchen in May 2023 ahead of the commissioning of
the WTP;
·
Work on the Feasibility Study continues with completion planned by the end of 2024; and
· Mr. Tony Trahar nominated by Vision Blue Resources as its representative on the Company's
board of directors (news release dated June 5, 2022)
Richard Williams, CEO of Cornish Metals, stated, "We are very pleased with the excellent
progress achieved on the advancement of South Crofty in recent months. The construction of the
water treatment plant is nearing completion and we anticipate its commissioning this summer,
followed by commencement of dewatering the mine.
Similarly, good progress is being on the metallurgical drill programme with its completion
anticipated in early summer. The results of this programme are feeding into the Feasibility Study
which is also progressing well. All these workstreams should result in a potential construction
decision being taken by the end of 2024.
After completion of the metallurgical drill programme in early summer, we are considering
options for the continuation of the exploration programmes at the Wide Formation, located along
the southern boundary of South Crofty Underground Permission area and only one kilometre
south of the South Crofty's Tuckingmill Decline, and United Downs, located 8km east of South
Crofty, to demonstrate the Mineral Resource potential of these targets.
We are continuing to actively engage with and receive strong support from the local community
and Cornwall Council."
Review of activities
Results from exploration program at United Downs
The Company commenced its exploration program at United Downs in April 2021. The drilling
activities were contracted to Priority Drilling Limited, under the supervision of the Company's
geological team.
Four targets were drill-tested: UD Lode, United Mines, Mount Wellington and Trenares Lode. The
key points to date arising from this drill program are:
· Multiple zones of copper - tin - silver - zinc mineralization were intersected;
· High-grade copper - tin mineralization was intersected down dip beneath the historic United Mines; and
· A transition from high-grade copper to high-grade tin at depth as well as increasing tin grades with depth
has been encountered, similar to the mineralization transition seen at South Crofty.
Details of the intercepts from the drill program can be found in the press releases dated July 5,
2021, August 30, 2021, November 3, 2021, December 6, 2021, June 29, 2022 and August 23,
2022. In total, 26 holes were drilled at United Downs amounting to 10,159 meters, of which all
assay results have been reported in these press releases. Drilling ceased at the end of May 2022,
with the metallurgical study drill program at South Crofty commencing soon thereafter, as
described below.
In summary, results from the United Downs exploration program confirm management's belief in
the potential to develop a Mineral Resource in the United Downs project area, especially the down
dip section of the United Mine where high-grade copper, tin and silver grades were encountered.
The Company is considering the next steps for advancing the United Downs project.
Results from exploration program at Carn Brea
Outside of the United Downs project area, a further target, Carn Brea, was also drill tested. Carn
Brea is located along the southern boundary of the South Crofty underground permission area. At
Carn Brea, eight holes were drilled totaling 2,501 meters. The drill holes confirmed up-dip, nearsurface, extensions of the historic Great Flat Lode and discovered tin mineralization in a new
target called the 'Wide Formation', inferred to lie parallel to, north of, and beneath the Great Flat
Lode. The Great Flat Lode was mined historically over a five kilometer strike length.
Management is of the view that there is merit in further exploring the Wide Formation as this
discovery is immediately adjacent to the South Crofty tin project. The Company is considering the
next steps for continuing the exploration program on the Wide Formation to better define its
geometry (strike and dip).
Construction progress of water treatment plant at South Crofty
The Company has employed key project management personnel, including a Project Manager and
Project Engineer, for construction and commissioning of the WTP.
Construction progress of the WTP at South Crofty has included various enabling works, including
completion of the treated water discharge duct from the WTP and the concrete foundation pad for
the WTP itself. The pipelines carrying water from the submersible pumps in New Cook's Kitchen
shaft to the WTP are substantially complete.
The WTP comprises nine reaction tanks for increasing and decreasing the pH to precipitate the
various metals in solution, and six inclined plate settling tanks (lamella clarifiers) to remove the
precipitated solids. All the tanks and clarifiers have been installed. The structural steel supports
and walkways which provide access to the WTP are currently being installed.
The mechanical, electrical and instrumentation equipment is expected to commence installation
by the end of April 2023 along with reagent storage, make-up and dosing equipment, which are
being supplied as complete packages from specialist manufacturers.
Sand Separation Systems Limited, an industry leader in the treatment of mine water, have
supported the running of a pilot plant to optimise the water treatment process flowsheet. This
workstream has resulted in a reduction in reagent consumption, an improvement to metal and
suspended solids recovery and an expected reduction in operating costs.
Overall, the current cost estimate for the WTP is expected to be between £6.5 million and £7.0
million, with commissioning planned in summer 2023.
Preference has been given, where
feasible, to suppliers located in Cornwall.
Preparation for mine dewatering at South Crofty
The Company has recruited additional employees to its mining team in anticipation of increased
mining related activities during dewatering of the mine and support for underground drilling. All
mine staff are receiving enhanced training reflecting the increased level of underground activities.
Two mine rescue teams have also been established as part of the mutual aid scheme operating in
the south-west of the UK.
New self-contained self-rescuers have been purchased and commissioned, with a new
underground refuge chamber also having been constructed and commissioned. New ventilation
ducting has been installed in support of the underground drilling for the metallurgical study drill
program, as noted below.
WiFi connections have been installed underground to provide
improved communications with surface.
The two submersible pumps for the mine dewatering purchased in 2018 are being tested ahead
of their lowering into the New Cook's Kitchen shaft. Lowering of the pumps into New Cook's
Kitchen shaft will commence in May 2023. Pump and pipe handling infrastructure has also been
installed around the headframe in readiness for the lowering of the pumps and pipes.
A new single drum winder has been ordered with delivery expected in October 2023. This winder
will enable the New Cook's Kitchen's shaft to be re-accessed once dewatering activities are
underway.
Metallurgical study drill program underway at South Crofty
A drill program as part of the South Crofty Feasibility Study was started in July 2022. The drill
program is anticipated to require approximately between 8,000 and 12,000 meters of drilling.
Three drill rigs have been contracted from Priority Drilling Limited, under the supervision of the
Company's geological team.
Two rigs are drilling from surface and one rig is drilling from
underground, collecting samples from the North Pool Zone (eastern section of Mineral Resource),
the No. 4 and No. 8 Lodes (central part of the Mineral Resource), Roskear and Dolcoath South
(western part of the Mineral Resource). These five main lodes / mineralized zones contain the
majority of the mineralized material anticipated to be processed during the first six years of mine
life.
All mineralized sample material required from No. 4 Lode, No. 8 Lode, Roskear and North Pool
Zone has been collected and initial metallurgical studies have commenced. All of the metallurgical
studies, except for Dolcoath South, are expected to be completed by the end of 2023 for inclusion
in the Feasibility Study planned for completion by the end of 2024.
The program is designed to collect samples for various metallurgical studies, including XRT ore
sorting, flowsheet optimisation and paste backfill studies, as well as collecting assay data to
complement the current Mineral Resource estimate. This testwork should allow acceleration of the
Feasibility Study in advance of dewatering the mine and will provide key information for the
mineral processing flowsheet, especially the amenability of the mineralized zones to ore sorting
which, if successful, will present an opportunity to deliver higher grade feed and reduce the size of
the processing plant.
Preparation of Feasibility Study
Work on the Feasibility Study has been underway since June 2022. In addition to the metallurgical
testwork program noted above, the Feasibility Study continues to advance with the following
activities:
·
Fairport Engineering has been engaged to design the process plant and estimate capital and operating
costs;
· A geotechnical site investigation for the process plant has been completed by AGS Ground Solutions;
· MiningOne has been engaged to conduct numerical modelling and ground control studies for underground
mining method and stope designs; and
· Entech Mining has been engaged to provide a study on the refurbishment, re-equipping and operation of
New Cook's Kitchen shaft.
It is planned that the Feasibility Study will be completed by the end of 2024.
Agreement of South Crofty mineral leases
On February 4, 2022, agreement was reached with Sir Ferrers Vyvyan of Trelowarren in Cornwall
to lease certain mineral rights owned by the Vyvyan family. The mineral lease covers an area of
222 hectares and is valid for 25 years. The lease will enable the Company to explore and mine
within all the mineral right areas owned by the Vyvyan family inside the South Crofty mine, and to
explore certain other mineral right areas adjacent to the South Crofty mine.
In addition, on October 19, 2022, agreement was reached with Roskear Minerals LLP ("Roskear
Minerals") to lease certain mineral rights located immediately adjacent to the southern boundary
of the South Crofty mine. The agreement covers an area of 49 hectares which includes part of the
historic Great Flat Lode and lies within the Company's Carn Brea exploration area, as noted above.
The agreement is for an initial prospecting lease for five years, with the Company having the
option to extend for a further five years if required. The agreement can be converted to a mining
lease at any time within the ten year period. The agreement will enable the Company to explore
and, if successful, mine within the lease area, subject to receipt of mining permissions for that
particular area that lies outside of the current South Crofty underground permission area.
These agreements supplement the agreement reached with Roskear Minerals in March 2021 (the
"Roskear Agreement") to lease their mineral rights within the South Crofty tin project. The Roskear
Agreement enables the Company to explore and develop the Mineral Resources that are contained
in the Roskear section of the South Crofty mine.
Strategic investment by Vision Blue Resources
On May 24, 2022, a financing of £40.5 million ($65.1 million based on the closing exchange rate
as at May 24, 2022) (the "Offering") was completed, which included a £25.0 million
(approximately $40.1 million based on the closing exchange rate as at May 24, 2022) strategic
investment by VBR. The balance of the Offering was completed through a private placement with
certain Canadian and UK investors and eligible private investors.
A summary of the Offering is described below. Further details can be found in the press releases
dated March 27, 2022 and May 23, 2022.
The Offering was structured through a unit offering comprising one common share at £0.18
($0.30 for Canadian investors) and a warrant to purchase one common share priced at £0.27
($0.45 for Canadian investors) for a period of 36 months from the closing date of the Offering. A
total of 225,000,000 units have been issued, comprising around 44.0% of the issued share capital
as at May 24, 2022, excluding the effect of the issuance of the Milestone Shares as described
below. VBR held approximately 27.2% of the enlarged issued share capital upon closing of the
Offering.
The planned use of the proceeds from the Offering is to complete the dewatering program and
Feasibility Study at South Crofty, evaluate downstream beneficiation opportunities and commence
potential on-site early works in advance of a potential construction decision. The proceeds raised
under the Offering are budgeted to fund a 30 month program from closing of the Offering.
Pursuant to an Investment Agreement entered into between the Company and VBR, upon closing
of the Offering, VBR retains the following rights, among others, subject to certain terms and
conditions:
· For so long as its shareholding in the Company is in aggregate not less than 10% of the Company's issued
share capital:
o Nomination of one person to the Company's board of directors as a non-executive director as an
additional director to the current board of directors (the "Investor Director"), with Mr. Trahar
being appointed to this position on June 6, 2022, as described below;
o Nomination of one person to the Company's technical committee to be formed from closing of the
Offering, which person may be a person other than the Investor Director; and
o A participation right to maintain its percentage ownership interest in the Company upon any
offering of securities at the subscription price and similar terms as are applicable to such offering;
and
·
For so long as its shareholding and its affiliates' shareholdings in the Company are in aggregate not less
than 5% of the Company's issued share capital, the appointment of an observer to the board of directors
of the Company.
On closing of the Offering, VBR entered into a Relationship Agreement with the Company and SP
Angel Corporate Finance LLP (the Company's nominated adviser on AIM), relating to the carrying
on of the Company's business in an independent manner following the closing of the Offering.
The Company has undertaken to VBR to use its reasonable commercial efforts to complete a
Feasibility Study in respect of South Crofty on or before 31 December 2024.
The Offering was subject to the approval of the TSX-V and shareholders, both of which were
received by May 19, 2022.
Issuance of shares as deferred consideration payable for the Cornwall mineral properties
On June 30, 2021, agreement was reached with Galena Special Situations Limited (formerly
Galena Special Situations Master Fund Limited) and Tin Shield Production Inc. (together the
"Sellers") to restructure the outstanding deferred consideration payable to the Sellers on the
acquisition of the South Crofty tin project and associated mineral rights (the "Side Letter"). The
fixed and variable payments that existed under the original share purchase agreement were
replaced with fixed payments linked to pre-agreed project related milestones.
Pursuant to the Side Letter, 20,298,333 common shares were issued to the Sellers on May 31,
2022 ("Milestone Shares"). This payment was triggered by the Company raising funding for the
dewatering of the South Crofty mine within the planned use of proceeds from the Offering, as
described above.
The Milestone Shares represent consideration equivalent to an amount of US$4,750,000
($6,089,500 at a US dollar / Canadian dollar exchange rate of 1.2820) at a deemed price of $0.30
per common share.
The deemed price was the same price under which Canadian investors
subscribed to the Offering pursuant to the terms of the Side Letter. The value of the Milestone
Shares in accordance with IFRS is $9,844,692, being the market price of the Milestone Shares at
their date of issuance.
As a result of this payment, the remaining deferred consideration payable to the Sellers is
US$5,000,000 in common shares, payable upon a decision to proceed with the development
and/or construction of a mine either at the South Crofty tin project or at the United Downs
property.
Disposal of Sleitat royalty to Electric Royalties
On May 27, 2022, the disposal of a 1% Net Smelter Royalty on the Sleitat tin-silver project located
in Alaska, USA to Electric Royalties Limited was completed. The consideration was $100,000 and
1,000,000 common shares in Electric Royalties, which in aggregate amounted to $355,000 at the
date of completion.
Appointment of new director
On June 6, 2022, Mr. Tony Trahar was nominated by VBR to serve as its representative on the
Company's board of directors. Mr. Trahar is currently a special adviser to VBR.
Mr. Trahar has had a 40 year career in the mining, natural resources and industrial sectors. From
2000 to 2007 he was Chief Executive of Anglo American Plc, one of the world's largest mining
groups, and was also a director of Anglo Gold, Anglo Platinum and De Beers.
From 1985 to 2000, Mr. Trahar was Chief Executive, and then Chairman of Mondi Ltd (now listed
in London as Mondi Plc), a multinational forestry, pulp, paper and packaging group. Since leaving
Anglo American, Mr. Trahar has also held a number of senior advisory roles for Barclays Natural
Resource Investments (2007 to 2013) and Macquarie Bank (2014 to 2016).
Financial highlights for the years ended January 31, 2023 and 2022
Years ended
January 31, 2023
January 31,
2022
Total operating expenses
3,448,124
3,007,748
Loss before income taxes
1,202,257
2,911,140
Loss for the year
1,218,257
2,911,140
(Expressed in Canadian dollars)
Net cash
activities
(used
in)
operating
(3,607,008)
(3,085,862)
Net cash
activities
(used
in)
investing
(10,318,376)
(3,988,978)
Net cash provided by financing
activities
61,657,081
13,963,043
Cash at end of the financial year
55,495,233
6,922,704
·
Higher promotional and corporate expenses following successful fundraise
cornerstoned by VBR and progression of the South Crofty tin project;
· Unrealized gain of $752,368 arising from increased valuation of holding in Cornish
Lithium (carrying value: $2.3 million at January 31, 2023) following its most recent
fundraising completed in June 2022;
·
Costs of $676,059 and $222,236 capitalized in connection with the exploration
programs at United Downs and Carn Brea, respectively (excluding capitalized
depreciation and other non-cash items);
·
Expenditure of $4.0 million on the construction of the WTP, related dewatering
equipment and new or replacement equipment for the mine;
· Other project related costs of $5.6 million incurred since the closing of the Offering
relating to the advancement of the South Crofty tin project to a potential
construction decision, primarily for the metallurgical drill program and planning
activities for the WTP;
·
Gross proceeds raised from the Offering of £40.5 million ($65.1 million), following
gross proceeds raised from the AIM listing in comparative period of £8.2 million
($14.4 million);
·
Interest income of $417,136 arising from increased interest rates being received
on higher cash balance following the Offering; and
· Foreign exchange gain of $758,216 arising from appreciation of the British pound
compared to the Canadian dollar since closing of the Offering and the resulting
translation impact on the cash balance.
Outlook
As described above, the proceeds raised from the Offering completed in May 2022 are being used
to advance the South Crofty tin project to a potential construction decision within 30 months from
closing of the Offering (December 2024). The planned use of the proceeds from the Offering is to
complete the dewatering program and Feasibility Study at South Crofty, evaluate downstream
beneficiation opportunities and commence potential on-site early works in advance of a potential
construction decision.
Within 30 months from the closing of the Offering, the Company's plans are as follows:
·
Construct and commission the WTP by the summer of 2023 and thereafter complete the
dewatering of the mine within 18 months;
·
Complete drill programs for metallurgical studies and to produce an updated JORC
compliant Mineral Resource estimate for a Feasibility Study;
·
Complete a Feasibility Study using all reasonable commercial efforts by the end of 2024;
and
· Commence basic and detailed engineering studies, construction of the processing plant,
refurbishment of underground facilities and other on-site early works.
Subject to the availability of financing, consideration will also be given to continuing with the
Company's exploration program at United Downs and evaluating other near-surface, high
potential, exploration targets within transport distance of the planned processing plant site at
South Crofty.
ABOUT CORNISH METALS
Cornish Metals completed the acquisition of the South Crofty tin and United Downs copper / tin
projects, plus additional mineral rights located in Cornwall, UK, in July 2016 (see Company news
release dated July 12, 2016). The additional mineral rights cover an area of approximately 15,000
hectares and are distributed throughout Cornwall. Some of these mineral rights cover old mines
that were historically worked for copper, tin, zinc, and tungsten.
TECHNICAL INFORMATION
The technical information in this news release has been compiled by Mr. Owen Mihalop. Mr.
Mihalop has reviewed and takes responsibility for the data and geological interpretation. Mr.
Owen Mihalop (MCSM, BSc (Hons), MSc, FGS, MIMMM, CEng) is Chief Operating Officer for Cornish
Metals Inc. and has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person
as defined under the JORC Code (2012) and as a Qualified Person under NI 43-101. Mr. Mihalop
consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
For additional information please contact:
In North America:
Irene Dorsman at (604) 200 6664 or by e-mail at irene@cornishmetals.com
In the UK:
SP Angel Corporate Finance
LLP
(Nominated Adviser & Joint
Broker)
Tel:
+44 203 470 0470
Richard Morrison
Charlie Bouverat
Grant Barker
Hannam & Partners
(Joint Broker)
Tel:
+44 207 907 8500
Matthew Hasson
Andrew Chubb
Ernest Bell
BlytheRay
(Financial PR/IR-London)
Tel:
+44 207 138 3204
Tim Blythe
Megan Ray
tim.blythe@blytheray.com
megan.ray@blytheray.com
ON BEHALF OF THE BOARD OF DIRECTORS
"Richard D. Williams"
Richard D. Williams, P.Geo
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Caution regarding forward looking statements
This news release contains "forward-looking statements" including, but not limited to, statements in connection with the
expected use of proceeds of the Offering, including in respect of certain work programs, expected construction, including
in respect of the WTP, and the potential completion of a Feasibility Study on the South Crofty mine and the timing thereof,
the exploration program at United Downs and other exploration opportunities surrounding the South Crofty tin project,
expected recruitment of various personnel, and expectations respecting tin pricing and other economic factors. Forwardlooking statements, while based on management's best estimates and assumptions at the time such statements are made,
are subject to risks and uncertainties that may cause actual results to be materially different from those expressed or
implied by such forward-looking statements, including but not limited to: risks related to receipt of regulatory approvals,
risks related to general economic and market conditions; risks related to the COVID-19 global pandemic and any variants
of COVID-19 which may arise; risks related to the availability of financing when required and on terms acceptable to the
Company and the potential consequences if the Company fails to obtain any such financing, such as a potential disruption
of the Company's exploration program(s); the timing and content of upcoming work programs; actual results of proposed
exploration activities; possible variations in Mineral Resources or grade; failure of plant, equipment or processes to
operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other
risks of the mining industry; changes in national and local government regulation of mining operations, tax rules and
regulations.
Although Cornish Metals has attempted to identify important factors that could cause actual results to differ materially
from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated,
estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and
future events could differ materially from those anticipated in such statements. Accordingly, readers should not place
undue reliance on forward-looking statements. Cornish Metals undertakes no obligation or responsibility to update
forward-looking statements, except as required by law.
Market Abuse Regulation (MAR) Disclosure
The information contained within this announcement is deemed by the Company to constitute inside information pursuant
to Article 7 of EU Regulation 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal)
Act 2018 as amended.
CONSOLIDATED STATEMENTS OF FINANCIAL POSITION
AS AT JANUARY 31
(Expressed in Canadian dollars)
20
ASSETS
Current
Cash
Marketable
securities
Receivables
Prepaid
$
55,495,232
656,407
2,718,9
expenses
371,977
59,242,552
Deposits
Property, plant
and equipment
Exploration and
evaluation